More info

SLAB BREAKAGE

The slab breakage is carried out when it is not possible to install the elevator in the former stair flight, but the building counts on wide spaces of access to the flats, or counts on wide common areas where it is possible to carry out the slab breakage on every floor.

These works are carried out under the surveillance of an architect that can ensure the feasibility of the installation.

LATEST INSTALLATIONS

See more
CALL US FOR MORE INFORMATION

+34 901444555

If you prefer we will contact you by email:
Send
atencion